Three-Phase Separator • High-Accuracy Metering • Sand Removal System • Rapid Deployment for New & Workover Wells
An oil production truck is a fully self-contained, truck-mounted mobile production system engineered for temporary oil production, well testing, oil-gas-water separation, flow metering, and early production operations at newly drilled, exploratory, or workover wells. Also widely known as a mobile oil production unit, well testing truck, early production facility (EPF), or mobile well testing and production unit, this versatile equipment eliminates the need for permanent surface facilities during the critical early phases of well evaluation and production startup.
Unlike fixed production facilities that require months of engineering, fabrication, civil works, and installation, a mobile oil production unit can be mobilized and rigged up in a fraction of the time. This makes it indispensable for operators who need to rapidly evaluate reservoir performance, collect representative fluid samples, measure flow rates under stabilized conditions, or monetize production from marginal and remote wells where permanent infrastructure is neither justified nor economically viable.
Henan Vance Petroleum Machinery Co., Ltd. designs and manufactures oil production trucks that meet the most demanding international standards. Every unit integrates a high-efficiency three-phase separator, custody-transfer-grade metering instrumentation, automated sand removal equipment, and comprehensive safety systems — all controlled from a climate-protected SCADA-enabled cabin.
High-efficiency horizontal three-phase separator (ASME VIII / API 12J) handling up to 500 m³/d liquid and 150,000 Nm³/d gas with exceptional separation efficiency even under high GOR or foaming conditions.
Coriolis mass flowmeters (±0.15% accuracy) for oil and water, orifice/ultrasonic gas metering, and full SCADA data logging with real-time transmission for reservoir engineering analysis.
Hydrocyclone desander removing particles ≥20μm with ≥95% efficiency, protecting downstream equipment and ensuring environmental compliance.
API 6A-rated manifold with hydraulic choke, ESD valves, HIPPS, and multiple well control barriers for safe, rapid hookup to any standard wellhead.
Fully enclosed, HVAC-controlled cabin with PLC-based SCADA, HMI touchscreen, real-time monitoring, alarm management, and remote data transmission (satellite/4G/5G).
Rugged 6×6 or 8×8 all-wheel-drive chassis with high payload capacity, excellent ground clearance, and highway-legal dimensions for rapid inter-location transit.
API 6A, API 12J, ASME, ISO 9001, ISO 14001, ATEX/IECEx, CE certified. Three-level ESD, fire & gas detection, PSVs, and zero-discharge design.
Pre-commissioned plug-and-play system ready for production in 4–8 hours. Fully customizable separator size, metering package, chemical injection, and auxiliary systems.
| Parameter | Specification |
|---|---|
| Separator Type | Horizontal three-phase (oil-gas-water), ASME VIII / API 12J |
| Liquid Handling Capacity | 50 – 500 m³/d (315 – 3,145 BOPD) |
| Gas Handling Capacity | 10,000 – 150,000 Nm³/d |
| Max Working Pressure | 10 MPa (1,450 psi) |
| Oil Metering | Coriolis mass flowmeter, ±0.15% accuracy |
| Water Metering | Coriolis mass flowmeter, ±0.2% accuracy |
| Gas Metering | Orifice plate or ultrasonic, ±1.0% accuracy |
| Sand Removal System | Hydrocyclone desander, ≥95% efficiency for ≥20μm particles |
| Chassis Configuration | 6×6 or 8×8 all-wheel-drive, up to 40 tonnes GVW |
| Control System | PLC-based SCADA with HMI touchscreen, remote monitoring |
| Rig-Up Time | 4–8 hours from arrival to first flow |
| Certifications | API 6A, API 12J, ASME VIII, ISO 9001, ISO 14001, CE, ATEX |
| Service Life | ≥15 years with recommended maintenance |
Complete surface handling for DST and extended well tests — separation, high-accuracy metering, sampling, and transient pressure data for reservoir characterization.
Start monetizing hydrocarbons immediately from marginal or remote wells before permanent facilities are built, generating early revenue and validating long-term productivity.
Post-workover cleanup, flow-back, and production testing to confirm stimulation success and optimize completion strategies.
Keep wells flowing and revenue streaming while permanent facilities are under construction or upgrade, preventing production deferral and formation damage.
Prolonged testing programs lasting weeks or months to satisfy regulatory requirements and demonstrate commercial viability.
Rapid mobilization to maintain production continuity and prevent uncontrolled releases during equipment failure or natural disasters.

Full Side View

Front-Quarter View

Rear View

Field Deployment View

Three-Phase Separator Close-Up

Flow Metering Skid

Wellhead Connection Manifold

Control Cabin & SCADA System
4–8 hours from arrival to first flow — dramatically faster than permanent facilities or conventional testing spreads.
Fraction of the cost of permanent facilities with full reusability across multiple wells and locations.
Custody-transfer-grade Coriolis metering (±0.15%) and full digital data acquisition for accurate reservoir evaluation.
Separator size, pressure rating, H₂S resistance, climatic packages, and control systems engineered to your exact requirements.
Training, 24/7 support, genuine spare parts, and field service engineers across 30+ countries.
Henan Vance Petroleum Machinery Co., Ltd. is a leading Chinese manufacturer of specialized petroleum equipment, headquartered in Puyang City, Henan Province. We design and build a comprehensive range of well testing equipment, oil and gas production equipment, wellhead and Christmas tree assemblies, choke manifolds, mud-gas separators, and mobile production systems for clients worldwide.
Contact our engineering team today for a tailored technical proposal and competitive quotation.
Technical resources
Prepare specifications, compare equipment, define inspection requirements and plan commissioning with practical project guides.